Pedro Balas
Contents
  1. Part A — The decision document
    1. 1.Decision on a page
    2. 2.The question
    3. 3.Options compared
    4. 4.Target architecture
    5. 5.Roadmap and gates
    6. 6.Cost model
    7. 7.Risk register
    8. 8.AI: where it pays
    9. 9.Monday actions
    10. +Assumptions and evidence
  2. Part B — What a Sprint delivers
    1. 10.What you get
    2. 11.How this was produced
    3. →Facing a decision like this?

Download the 4-page excerpt (PDF)

Book a call

Illustrative example. Norval Components is a fictional company. The people, situation and figures are invented to show the format and depth of a Sprint deliverable. They are not a real client result.

One illustrative case: a manufacturer weighing a €1.6M ERP/MES replacement. The same method applies to any significant system.

ARCHITECTURE & AI SPRINT · DECISION DOCUMENT · ILLUSTRATIVE

Norval Components: should we commit €1.6M to a new ERP and MES?

  • Prepared for: Board of Directors
  • Sprint: 2 weeks
  • Version 1.0 · Final
  • Classification: Board confidential (fictional)

11 min read

Download the 4-page excerpt (PDF)

Part A — The decision document

1.

Decision on a page #

Takeaway: Don't sign the €1.6M contract now; fund a €380k–€520k staged programme.

Decision requested: Approve a €1.6M ERP + MES replacement (vendor quote, 24–30 months).

Our recommendation: Don't approve it now. Approve a €380k–€520k staged programme instead: a data and integration layer, shop-floor data capture and two targeted AI use cases. Re-decide the ERP at month 15 using real data.

  • Capital deferred€1.0M–€1.3Mnot committed now
  • 3-year TCO vs. rebuild€0.8M–€1.6M lower
  • Time to first value12 weeks(live shop-floor dashboard, plant 1)
  • First go/no-go gateMonth 5no more than €300k committed before Gate 1
  • ConfidenceMedium–highMain uncertainty: ERP vendor API support, to be confirmed in week 1

All figures are illustrative ranges for a fictional company. All figures are planning estimates from a 2-week review, with an accuracy of ±20–30%, to be refined at each gate.

2.

The question the board asked #

Takeaway: A 17-year-old ERP, spreadsheets on the shop floor and a €1.6M quote on the table.

“Our ERP is 17 years old, our two plants run on spreadsheets between machines and the office, and a vendor is offering us a full ERP + MES replacement for €1.6M. Customers want quotes faster and OEMs are asking for traceability. Is this the right investment, and where does AI actually help us?”

Norval Components (fictional) is a mid-sized maker of machined and stamped metal parts for automotive and industrial OEMs: two plants, around 650 people and about €95M in revenue. Quotes take 4–6 working days. Production status is collected by hand at the end of each shift. Scrap is around 4.5% (estimated from internal reports).

What we did in two weeks: 10 interviews (board, plant managers, sales, quality, IT, two key customers) · review of 6 key systems and one data sample · vendor quote teardown · 3 options costed · 1 recommendation.

3.

Options compared #

Takeaway: C scores 4.2 out of 5: it fixes the data now and keeps A as an option.

Scores run from 1 (poor) to 5 (best). A higher score is always better, so “Risk 5” means lowest risk.

Criterion (weight)A. Full ERP + MES replacementB. Keep everything, add AI on topC. Data layer + shop-floor data + targeted AI (recommended) Recommended
Cost (25%)1€1.4M–€1.8M capex5€150k–€250k4€380k–€520k
Time to value (20%)118+ months43–4 months412 weeks
Delivery risk (25%)1two-plant cutover3low build, weak results4staged, gated
Lock-in (15%)2single vendor suite3AI tied to legacy data4owned data layer
AI leverage (15%)3later, after go-live2AI on dirty data5clean data by month 5
Weighted score1.53.64.2
  • C. Data layer + shop-floor data + targeted AI (recommended) Recommended

    • Cost (25%)4€380k–€520k
    • Time to value (20%)412 weeks
    • Delivery risk (25%)4staged, gated
    • Lock-in (15%)4owned data layer
    • AI leverage (15%)5clean data by month 5

    Weighted score: 4.2

  • B. Keep everything, add AI on top

    • Cost (25%)5€150k–€250k
    • Time to value (20%)43–4 months
    • Delivery risk (25%)3low build, weak results
    • Lock-in (15%)3AI tied to legacy data
    • AI leverage (15%)2AI on dirty data

    Weighted score: 3.6

  • A. Full ERP + MES replacement

    • Cost (25%)1€1.4M–€1.8M capex
    • Time to value (20%)118+ months
    • Delivery risk (25%)1two-plant cutover
    • Lock-in (15%)2single vendor suite
    • AI leverage (15%)3later, after go-live

    Weighted score: 1.5

How we scored: each option is rated 1–5 on cost, time to value, delivery risk, vendor lock-in and AI leverage, weighted by what the board said matters most (cost and delivery risk 25% each, time to value 20%, vendor lock-in and AI leverage 15% each). Scores are judgements from the Sprint's evidence, not measurements.

B is cheaper but doesn't fix the data, so the AI underdelivers. A fixes everything, but too late and at too high a risk. C fixes the data now and keeps A as an option.

4.

Target architecture #

Takeaway: Keep the ERP, build an owned data layer in the middle, buy the shop-floor kit.

Keep the ERP as the system of record for finance and orders. Put an owned data and integration layer in the middle, so every new capability plugs into clean data instead of into the ERP.

Layered target architecture. Top: people and channels. Then AI services. In the middle, the owned data and integration layer (build). Below, shop-floor capture (buy/configure). Bottom: systems kept, with the ERP kept and integrated through the API gateway.People and channelsSales and quoting workspacePlant dashboards (2 plants)Customer portal (phase 3, optional)AI servicesQuote assistantQuality anomaly alertsData and integration layer (build, owned)BuildAPI gateway + event busMaster data: parts, customers, routingsOperational data storeShop-floor capture (buy)Buy/configureMachine connectors / IIoT gatewayOperator tablets (scrap and downtime reasons)Systems keptKeepERP (keep, integrate)CAD/PDMQuality system

Build = owned and built · Buy/configure = standard product · Keep = existing system, integrated

5.

Roadmap: 18 months, three phases, three gates #

Takeaway: Three phases, three gates. If G1 fails, you stop at €300k or less.

Gantt strip over 18 months: data foundation months 1–5 with gate G1 at month 5; shop floor months 5–10 with G2 at month 10; targeted AI months 8–12 with G3 at month 12; ERP decision months 15–18 with the board decision at month 15.Month123456789101112131415161718Data foundationG1Shop floorG2Targeted AIG3ERP decisionBoard
PhaseMonthsWhat shipsCostGate (go/no-go)
1. Data foundation1–5Integration layer, master data clean-up, live dashboard in plant 1 by week 12€220k–€300kG1, month 5: ERP integration stable; ≥90% of plant 1 machines reporting; part master ≥95% clean
2. Shop floor5–10Plant 2 roll-out, operator tablets, scrap and downtime reasons€100k–€140kG2, month 10: scrap reasons captured on ≥80% of shifts; baseline OEE agreed; machine data ready for phase 3 alerts
3. Targeted AI8–12Quote assistant (pilot with 3 estimators), quality alerts€60k–€80kG3, month 12: quote lead time ≤2 days on pilot; estimator acceptance ≥70%
ERP decision15–18Re-decide the ERP with 12 months of real dataEstimated thenBoard decision, month 15

Total for phases 1–3: €380k–€520k. The phases overlap from months 8–10 by design. Phase 3 quality alerts depend on phase 2 machine data, checked at G2.

If G1 fails, stop. You've spent at most €300k, and the data clean-up is still worth having.

6.

Cost model #

Takeaway: C's 3-year TCO is €1.2M–€1.4M, against €2.2M–€2.8M for A.

Assumption: the current ERP and spreadsheets cost €220k a year to run (licences, support, internal IT time).

A. Full replacementB. AI on topC. Recommended
Capex€1.4M–€1.8M€150k–€250k€380k–€520k
Opex per year€270k–€320k€260k–€280k€270k–€290k
3-year TCO€2.2M–€2.8M€0.9M–€1.1M€1.2M–€1.4M
Capital at risk before first proof€0.7M–€1.1M€150k–€250k€220k–€300k

C costs about €0.1M–€0.5M more than B over three years. That buys clean data, which is what makes the AI work. If you later still need A, the data layer carries over, so the C spend isn't wasted. Assumes A's first spend milestone is about 50–60% of capex.

Value side, deliberately cautious: quote lead time goes from 4–6 days to 1–2. Each 1 point of scrap reduction is worth about €0.5M–€0.6M a year at Norval's material spend (estimate, to be measured in phase 2). We don't book any value until G2 has a measured baseline.

7.

Risk register (top 5) #

Takeaway: Five risks, each with a named owner and a mitigation.

#RiskLikelihoodImpactMitigationOwner
1ERP vendor limits API access or charges for itMediumHighWritten confirmation and pricing in week 1; fallback to database-level read integrationCIO
2Part master data worse than sampledHighMedium6-week clean-up sprint in phase 1; G1 threshold ≥95%Ops director
3Operators don't log scrap reasonsMediumHighTwo-tap tablet design; shift leads co-design; tracked at G2Plant managers
4Estimators distrust the AI quote draftsMediumMediumHuman approves every quote; pilot with 3 estimators; acceptance KPISales director
5Integration layer becomes “shadow IT” with no ownerLowHighNamed product owner; documented APIs; 20% of build time on handoverCIO

Risks of the recommended option (C)

  • Ownership: the data layer needs a named data owner in each plant and 0.5–1 FTE internally or a support contract; without them, master data degrades and G1 fails.
  • OT security: connecting machines to the data layer exposes the shop-floor network, so it needs network segmentation plus an OT security review before phase 2.
  • Database-level fallback: if API access fails, database-level access is read-only and only a stopgap; check the ERP licence first, as it may not allow it.
  • Integration upkeep: ERP or MES upgrades can break interfaces; budget for maintenance and regression tests in opex.
8.

AI: where it pays and where it doesn't #

Takeaway: Two AI use cases tied to money; the rest waits or doesn't happen.

Use caseValueData ready?Verdict
Quote assistant (RFQ + drawings → draft quote)High: faster quotes win ordersYes, 8 years of past jobsDo: phase 3
Quality anomaly alerts from machine dataHigh: less scrapPhase 2, unlocks Phase 3 alertsDo: phase 3
Predictive maintenanceMediumNo, too little failure historyLater: collect data first
Demand forecastingMediumPartly; OEM call-offs already drive the planLater
Generic chatbot for customers or staffLown/aDon't
“AI strategy” platform licenceUnclearn/aDon't buy before a use case proves value

Two AI use cases, both tied to money. Everything else waits for data or doesn't happen at all.

9.

What we'd do on Monday #

Takeaway: Five actions the board can take next week.

  1. Pause signature on the €1.6M contract and tell the vendor the decision moves to month 15.
  2. Send the ERP vendor the API access request (template in appendix B).
  3. Name a product owner for the data layer: an internal person, not a supplier.
  4. Start the part master clean-up in plant 1, using the 300 highest-volume part numbers first.
  5. Book Gate 1 into the board calendar for month 5.

Assumptions and evidence

Show the 14 assumptions and evidence behind the figures
ItemSourceStatus
ERP is 17 years oldSystems reviewClient
Two plants, around 650 people, about €95M revenueCompany dataClient
Quotes take 4–6 working daysSales interviewsClient
Scrap around 4.5%Quality reportsClient
Current ERP and spreadsheets cost €220k a year to runIT and financeClient
Vendor quote: €1.6M, 24–30 monthsVendor proposalClient
Capex and opex ranges for options A–CCosted in the Sprint; illustrative rangeEstimate
3-year TCO by optionCost model; illustrative rangeEstimate
8 years of past jobs available for quotingSystems reviewClient
ERP vendor API access and pricingConfirm in week 1To validate
Part master can reach ≥95% clean in phase 1Data sample; tested at G1To validate
Baseline OEEAgreed at G2To validate
1 point of scrap reduction is worth €0.5M–€0.6M a yearMaterial spend; measured in phase 2; illustrative rangeEstimate
Estimator acceptance of AI drafts ≥70%Pilot; tested at G3To validate

Part B — What a Sprint delivers

10.

What you get in the Sprint #

Takeaway: Every section above maps to something you receive in two weeks.

On this pageWhat you receive
Decision on a pageA board-ready 2-page executive memo
The questionProblem statement agreed with you on day 2
Options comparedA scored options matrix, with weights you can change
Target architectureAn architecture diagram + build/buy/keep decisions
Roadmap with gatesA 12–18 month phased plan with go/no-go criteria
Cost modelCapex/opex and 3-year TCO by option (spreadsheet)
Risk registerTop risks with owners and mitigations
AI tableAI use cases ranked by value and data readiness
Monday actionsA first-30-days action list
—A 60-minute board or leadership read-out

Two weeks. Fixed price, from €6,000.

11.

How this was produced #

Takeaway: One senior architect, two weeks, no more than 60 hours.

Team
One senior architect.
Time
2 weeks, no more than 60 hours.
Inputs
8–10 interviews, the key systems and one data sample.
Work
Vendor-quote teardown, 3 options costed, board pack.
What we need from you
A sponsor, about 6–8 hours of your people's time, and one data extract.

Not a full audit: no code review, penetration test, full data profiling or legal review.

Facing a decision like Norval's?

Most of the cost of a technology programme is decided before anyone writes code. If you have a big platform, modernisation or AI decision on the table, a 30-minute call is enough to see whether a Sprint would help.

Book a call

Norval Components is fictional. All figures are illustrative.